cancel
Showing results for 
Search instead for 
Did you mean: 
pm-elba
Level 2

won't mark build as final even though everything is in stock

Cannot mark build as final even though everything has been allotted to it.

Also shows the maximum number I can make is 23kg even though I have enough for 40kg

 

Shortage Report Shows that I'm not missing anything

 

2 Comments 2
Rustler
Level 15

won't mark build as final even though everything is in stock

Not sure if this is the problem or not, but QB is date specific.  Run a quick report on each item in the build and set the quick report date range to ALL and refresh.  If an item has been received in the future, it will show as on hand but not be available for the build

pm-elba
Level 2

won't mark build as final even though everything is in stock

thank you

Date was the current date when I was trying.

I think it has to do with if there is another build assembly open that requires the same material but dated earlier

Need to get in touch?

Contact us